black and white bed linen

Pipeline Installation

Expert HDD pipeline installation with reliable equipment and proven results

HDD Rig - XCMG XZ2860

Classification: Primary Drilling Rig
Operational Unit: TFC3 - 320 short ton
Capacity: 290 metric ton static pull force

Technical Description:

The XCMG XZ2860 represents the optimal HDD rig configuration designed for medium-scale directional drilling operations. This compact yet robust drilling system is engineered for flexibility and mobility in challenging terrain conditions. The rig features an integrated drill string management system with automated tension control mechanisms, enabling precise drilling fluid circulation and drill pipe feed rates.

Equipment fleet

Our equipment for Horizontal Directional Drilling

HDD Rig - XCMG XZ5060

Classification: Primary Drilling Rig
Operational Unit: TFC2 - 570 short ton
Capacity: 520 metric ton static pull force

Technical Description:

The XCMG XZ5060 constitutes the maxi-range HDD platform, engineered for demanding horizontal directional drilling applications. This system demonstrates enhanced pulling power and drilling capacity compared to entry-level configurations, supporting larger diameter pipe installations and extended drilling distances. The rig incorporates advanced vibration dampening and load distribution technologies.

HDD Rig - XCMG XZ5000

Classification: Primary Drilling Rig
Operational Unit: TFC1 - 560 short ton
Capacity: 510 metric ton static pull force

Technical Description:

The TFC1 unit features an XCMG XZ5000 configuration optimized for versatile drilling operations, providing exceptional balance between mobility and drilling capacity. This platform is the workhorse configuration suitable for diverse HDD applications across varying geological and operational contexts.

LOW PRESSURE MUD SYSTEM: 3 sets

Mixing unit - drilling fluid treatment - storage and reserve tank - sunction tank - recycles system.

BARREL REAMER - FLY CUTTER - ROCK HOLE OPENER - CENTERLIZER RING

16 INCH BARREL REAMER

20 INCH BARREL REAMER

26 INCH BARREL REAMER

30 INCH BARREL REAMER

34 INCH BARREL REAMER

42 INCH BARREL REAMER

46 INCH BARREL REAMER

48 INCH BARREL REAMER

54 INCH BARREL REAMER

58 INCH BARREL REAMER

64 INCH BARREL REAMER

68 INCH BARREL REAMER

38 INCH FLY CUTTER

28 INCH FLY CUTTER

50 INCH FLY CUTTER

16 INCH LO TORQUE HOLE OPENER

22 INCH LO TORQUE HOLE OPENER

30 INCH LO TORQUE HOLE OPENER

34 INCH LO TORQUE HOLE OPENER

14 INCH STABLIZER-CENTRALIZER RING

20 INCH STABLIZER-CENTRALIZER RING

28 INCH STABLIZER-CENTRALIZER RING

30 INCH STABLIZER-CENTRALIZER RING

STEERING SYSTEM

Our company employs advanced Vector Magnetics technologies to guarantee the highest standards of precision throughout all phases of HDD drilling operations.

The ParaTrack 2 guidance system, utilized in combination with the RivCross software suite and gyro instrumentation, enables highly accurate borehole tracking by integrating vector magnetic measurements with inertial data. This configuration ensures dependable trajectory control even within complex and demanding geological contexts.

In addition, our company is equipped:

  • N. 3 sets of ParaTrack 2 systems

  • N. 2 sets of Gyro North Seeker

  • N.2 sets of Pressure Module System

  • N.1 Tripod BTS unit

Each unit is supplied with a full set of the latest-generation accessories, allowing us to operate with complete autonomy and superior technological capability.

The implementation of Vector Magnetics’ PMR (Passive Magnetic Ranging) technology has further enabled the successful completion of extended crossings exceeding 3,000 meters in challenging terrains and environmentally sensitive areas.

Collectively, these systems provide exceptional accuracy, operational reliability, and comprehensive oversight for all drilling activities.

HIGH PRESSURE MUD SYSTEM: 3 sets

Mud pumps.

Installation works

Delivering trenchless solutions across the world.

Trenchless Frontiers specializes in providing trenchless solutions for the successful execution of pipeline and utility installation projects, regardless of their scale. Whether operating in environmentally sensitive areas or within the urban core, we challenge conventional methodologies and deliver exceptional results.

We are committed to the principle that superior quality and elevated technical standards should not necessitate exorbitant costs.

By pushing the boundaries of Horizontal Directional Drilling, we innovatively sustain a competitive pricing structure.

Projects

At Trenchless Frontiers, our team brings a wealth of experience from their previous roles, contributing to our collective expertise and innovative approach. Our professionals have honed their skills through a variety of challenging projects, which have equipped them with the knowledge and capabilities to deliver exceptional results.

Some of the notable projects our team members have successfully completed include:

QA -SP1 Qarmatali - Rumaila Oil Field HDD 48" Steel Coated 730m

SP1-SP2 Rumaila Oil Field HDD 48" Steel Coated 480m

Gulf Crossing HDD - Intersection 30" Steel Coated 3000m

Gulf Crossing HDD - Intersection 6" FOC Conduit, parallel with live gas line 3000 m

MOD Canal - Rumaila Oil Filed HDD 30" + 16" Carbon Steel + GRE 350m

West Qurna I MOD - Rumaila Oil Field HDD 18" Steel Coated 982m

Yabanii River Crossing - Majnoon Oil Field HDD 28" Steel Coated 514m

Sea Shore Approach (Land Out Fall) HDD - Shore Approach 36" 36" (40.6" W/ CWC) 1300m

Rocky Mountain Crossing Gasline HDD – Mountain 18 x 24 CSG 18" Gasline x 24" Casing 435m

Canal - Road Crossing - Gasline HDD 20 Steel Coated 1120m

Salt Pit - Pipe Lines - Complex Refinery Crossing HDD 20 Steel Coated 850m

Gulf Crossing - Island to Main Land HDD 6 Steel Coated 2250m

Customized solutions for the most challenging environments

Our commitment to excellence is reflected in the quality of our work and the satisfaction of our clients. We continue to leverage our past experiences to drive future success and deliver outstanding solutions.

FAQs

What is HDD?

HDD stands for Horizontal Directional Drilling, a trenchless pipeline installation method.

How long does installation take?

Installation time varies by project size and ground conditions but typically ranges from days to weeks.

What equipment do you use?

Our fleet includes state-of-the-art HDD rigs, mud recycling systems, and guidance technology to ensure precise pipeline placement.

Are projects environmentally safe?

Yes, HDD minimizes surface disruption and protects sensitive areas during installation.

Do you handle permits?

We assist clients with permit requirements to streamline project approval.

Can you share past project examples?

We’ve completed pipelines under rivers, roads, and performed shore approaches, showcasing our adaptability and expertise.